Customization: | Available |
---|---|
Top Style: | Ridge Tent |
Capacity: | >10 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Basic structure of the tent stadium
Frame material: Lightweight yet sturdy aluminum alloy or steel frames are selected to ensure wind and stability.
Top covering: Waterproof and sun-resistant PVC or polyester fiber canvas, which can be designed as arched or pointed to facilitate drainage.
G treatment: Laying artificial grass or anti-slip mats, with the edges fixed to the bottom of the tent to prevent wind and rain from entering.
2. Cur system design Curtain functions:
Sunshade adjustment: Adjust the opening and closing of the curtains according to the angle of the sun to avoid glare affecting the game.
Privacy protection: Close the curtains during training or non-public activities. Wind and dust resistance: Partially close the curtains in bad weather to protect the indoor.
Curtain types: Built-in curtains: Install sliding tracks on the inner side of the tent supports, allowing curtains to open and close horizontally (similar bus curtains), saving space.
Hanging curtains: The rollable curtains hanging down from the top of the tent (like vertical blinds), with breathable and polyester fabric used.
Sectional design: Divide the side of the tent into multiple areas, with each area having independent curtain control for flexible ventilation and light adjustment.
Material selection: Sheer curtains: Used on the inside, ensuring soft light while blocking mosquitoes. Blackout curtains: Used on the outside, for strong sh or when privacy is needed.
Waterproof coating: If the tent is semi-open, the curtains need to be waterproof.
3.Scene application Game mode: Curtains are fully opened to ensure ventilation and audience visibility. Training mode: Half-close the curtains to reduce external interference. Night mode: Close the curtains and use internal lighting to avoid light pollution.
Activity Weatherproof Canopy | |||||
The upper part of the electric tent (m) | Stretch Long | Width | Clear Height | ||
20 | 10 | 1.5 | |||
No. | Item | Specification | Unit | Quantity | Unit Price |
Canopy skeleton | |||||
1 | Skeleton arc top | 25×50×1.5mm flat tube | Set | 18 | |
2 | Skeleton beam | 50×50×1.5mm square tube | |||
3 | Skeleton bracing | 20×40×1.5mm square tube | |||
4 | Top Scissor Holder | 40×20×1.2mm flat tube | Pair | 16 | |
5 | Column scissors stand | 25×50×1.2mm flat tube | Pair | 32 | |
6 | column | 76 round tube 1.5mm | Post | 36 | |
7 | beam H steel beam | 100×100H steel column | Meter | 40 | |
8 | Motor 2.5m head | 4 motors | 4 | ||
9 | Top fabric | Hubei Jinlong 650g knife scraping cloth | Square Meter | 352 |
Membrane structure stadium tent | ||||
No. | Item | Unit | Engineering quantity | Marks |
A | Membrane structure part | |||
1 | Membrane material | m | 374 | pvdf1050g white architectural membrane |
2 | Membrane loss and auxiliary materials | m | 37 | pvdf1050g white architectural membrane |
3 | Membrane processing | m | 411 | Contains welding accessories |
4 | laminated board | m | 108 | 25x2.5 galvanized layering |
6 | drill tail wire | Box | 3 | Membrane heat sealing waterproof |
10 | Subtotal | |||
B | Main steel structure part | |||
1 | H200-120*6*8 column | branch | 8 | Q235B |
2 | H200-120*6*8 girder | branch | 4 | Q235B |
3 | 114x3 cross bar | branch | 25 | Q235B |
4 | 60x2 pole | branch | 6 | Q235B |
5 | 120x120x3.5 square tube | branch | 2 | Q235B |
6 | appendix | item | 1 | Including head plate connecting plate reinforcement plate and bolts |
7 | Steel derusting | item | 1 | |
C | Painting and others | |||
1 | spraying | Item | 1 | 2 coats of primer, 2 coats of top coat |
2 | Package | Item | 1 | Including packaging film and lab |